CENTRAL AXIS TILTING FURNACE
CENTRAL AXIS TILTING FURNACE
Central Axis Tilting Furnace Manufacturer India
CENTRAL AXIS TILTING FURNACES are supplied as complete refractory line packages with blower, burner and crucible (not guaranteed). The durable body is constructed from thick reinforced steel plates and supported on a stand by turnnions which move on a anti-friction bearings. A graphite crucible and stand are providing, along with the muffle ring and cover for top of the crucible. (Depending on the size and client’s option).Central Axis Tilting Furnace Manufacturer India
A Side mounted tilting gear arrangement with a large hand wheel allows easy manual operation (motorized & hydraulic tilting with inching facility available).
The furnace is fitted with Axis self propotionating Oil/Gas burner. Preheated oil at content pressures is supplied by a Axis pumping and heating system. Combustion air will be supplied by Axis centrifugal air blower to burner.
The burner fires tangentially inside the shell lining into a circular combustion spaces so that the hot gases surround the crucible, ensuring uniform heating. Waste gases pass out through a flue at one side, allowing reasonable working conditions for the operator. Normally the flue discharge is upward for top exhaust. Optionally, waste gases collected in a fume extraction hood for discharge outside the production area.
OPTIONAL ACCESSORIES
- Oil service tank
- Out flow heater
- Semi rotory pump for oil tank
- Fume extraction unit
HIGHLIGHTS | |
---|---|
|
|
PERFORMANCE DATA FOR GUN METAL |
|||||
---|---|---|---|---|---|
FURNACE MODEL | tt - 2 | tt - 4 | tt - 6 | tt - 10 | tt - 20 |
NOMINAL CHARGE CAPACITY in kg | 100 | 200 | 300 | 500 | 1000 |
APPROXMELTING TIME FROMCOLD | 120 | 120 | 120 | 120 | 120 |
APPROXMELTING TIME FOR SUBSEQUENT CHARGE | 90 | 90 | 90 | 90 | 90 |
OIL CONSUMPTION FOR SUBSEQUENT HEAT Litres per 100 kg of metal | 20-25 | 20-25 | 20-25 | 20-25 | 20-25 |
SPOUTED CRUCIBLE | TP-162 | TP-400 | TP-600 | TP-89 | TP-412 |
PERFORMANCE DATA FOR ALUMINIUM |
|||||
---|---|---|---|---|---|
FURNACE MODEL | tt - 2 | tt - 4 | tt - 6 | tt - 10 | tt - 20 |
NOMINAL CHARGE CAPACITY in kg | 30 | 66 | 100 | 150 | 300 |
APPROX MELTING TIME FROM COLD | 120 | 120 | 120 | 120 | 120 |
APPROXMELTING TIME FOR SUBSEQUENT CHARGE | 90 | 90 | 90 | 90 | 90 |
OIL CONSUMPTION FOR SUBSEQUENT HEAT Litres per 100kg of metal | 20-25 | 20-25 | 20-25 | 20-25 | 20-25 |
SPOUTED CRUCIBLE | TP-162 | TP-400 | TP-600 | TP-89 | TP-412 |